Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.
Production scheduling
TS157
.
5
.
B35
2009
Baker, Kenneth R.,1943-
Trietsch, Dan
ایران
Principles of sequencing and scheduling Kenneth R. Baker, Dan Trietsch