From the contents: Introduction --; Description of the Problems --; Classification of Schedules --; Characterisation and Generation of Instances --; The Single-Mode Project Scheduling Problem --; The Multi-Mode Project Scheduling Problem --; Project Scheduling with Given Deadline --; Project Scheduling with Setup Times --; Applications to Production Management --; Concluding Remarks --; List of Notations --; List of Abbreviations --; References.
یادداشتهای مربوط به خلاصه یا چکیده
متن يادداشت
This book introduces the field of resource-constrained project scheduling. State-of-the-art reviews of optimal and heuristic procedures are provided for classical project scheduling models. Furthermore, new models which are relevant for practical problem settings, are introduced. The main emphasis is on newly developed competitive heuristic methods. Contents: Introduction. - Description of the Problems.- Classification of Schedules.- Characterisation and Generation of Instances.- The Single-Mode Project Scheduling Problem.- The Multi-Mode Project Scheduling Problem.- Project Scheduling with Given Deadline.- Project Scheduling with Setup Times.- Applications to Production Management.- Concluding Remarks.- List of Notations.- List of Abbreviations.
موضوع (اسم عام یاعبارت اسمی عام)
موضوع مستند نشده
Heuristic programming.
موضوع مستند نشده
Production scheduling -- Data processing.
رده بندی کنگره
شماره رده
TS157
.
5
نشانه اثر
R356
1995
نام شخص به منزله سر شناسه - (مسئولیت معنوی درجه اول )