Construction scheduling, cost optimization, and managemen
General Material Designation
[Electronic Resource]
Other Title Information
:a new model based on neurocomputing and object technologies
First Statement of Responsibility
/ Hojjat Adeli, Asim Karim
.PUBLICATION, DISTRIBUTION, ETC
Place of Publication, Distribution, etc.
London ;New York
Name of Publisher, Distributor, etc.
: Spon Press,
Date of Publication, Distribution, etc.
, 2001.
PHYSICAL DESCRIPTION
Specific Material Designation and Extent of Item
1 online resource.
NOTES PERTAINING TO PUBLICATION, DISTRIBUTION, ETC.
Text of Note
e
INTERNAL BIBLIOGRAPHIES/INDEXES NOTE
Text of Note
Includes bibliographical references (p. 289-313) and index.
CONTENTS NOTE
Text of Note
BOOK COVER; TITLE; COPYRIGHT; DEDICATION; CONTENTS; PREFACE; ACKNOWLEDGMENT; ABOUT THE AUTHORS; 1 INTRODUCTION; 2 OVERVIEW OF NEURAL NETWORKS IN CIVIL ENGINEERING; 3 NEURAL DYNAMICS MODEL AND ITS APPLICATION TO ENGINEERING DESIGN OPTIMIZATION; 4 PROJECT PLANNING AND MANAGEMENT AND CPM; 5 A GENERAL MATHEMATICAL FORMULATION FOR PROJECT SCHEDULING AND COST OPTIMIZATION; 6 NEURAL DYNAMICS COST OPTIMIZATION MODEL FOR CONSTRUCTION PROJECTS; 7 OBJECT-ORIENTED INFORMATION MODEL FOR CONSTRUCTION PROJECT MANAGEMENT; 8 THE CONSCOM FRAMEWORK