بررسی مسائل زمین شناسی مهندسی پروژههای گودبرداری عمیق در منطقه نگین پارک تبریز و ارائه روشهای پایدارسازی
Parallel Title Proper
Investigation on engineering geology issues in the deep excavation projects of Negin Park of Tabriz area and finding stabilization methods
First Statement of Responsibility
/زهرا پارسا
.PUBLICATION, DISTRIBUTION, ETC
Name of Publisher, Distributor, etc.
: علوم طبیعی
Date of Publication, Distribution, etc.
، ۱۳۹۷
Name of Manufacturer
، افشاری
PHYSICAL DESCRIPTION
Specific Material Designation and Extent of Item
۱۳۸ص
NOTES PERTAINING TO PUBLICATION, DISTRIBUTION, ETC.
Text of Note
چاپی - الکترونیکی
DISSERTATION (THESIS) NOTE
Dissertation or thesis details and type of degree
کارشناسی ارشد
Discipline of degree
زمین شناسی گرایش آب شناسی
Date of degree
۱۳۹۷/۱۱/۱۵
Body granting the degree
تبریز
SUMMARY OR ABSTRACT
Text of Note
در سالصهای اخیر با افزایش چشمگیر بهای زمین، تراکم و تعداد طبقات ساختمانصها و نیاز به تأمین پارکینگ و سایر سطوح خدماتی در ساختمانصهای شهرهای کشور و بهص خصوص کلان شهرها، عمق گودبرداریصها بیشتر شده است .بدیهی است با انجام گودبرداری و بهص خصوص گودبرداریصهای عمیق، ناپایداری دیوارههای گود مهم شده و نیاز به مطالعه، طراحی و اجرای طرحهای حفاظت دارد .منطقه نگین پارک در شرق تبریز به مساحت حدود ۱۱۰ هکتار دارای توپوگرافی تپه ماهوری بوده و لذا در موقع شهرسازی قسمت بالای تپهها خاکبرداری شده و در درهها و گودیصها ریخته شده است .همچنین در این منطقه لایههای مارنی گسترش فراوانی دارند .گسترش خاکهای دستی و وجود لایههای مارنی که از نظر ژئوتکنیکی استحکام و پایداری کمی دارند، مهمترین چالش اجرای پروژههای گودبرداری عمیق برای احداث ساختمان در این منطقه میباشد .با بررسی عکسصهای هوایی قدیمی و ماهوارهای، نقشههای زمین شناسی، همچنین با مطالعات صحرایی، بازدید گودهای در حال اجرا و جمع آوری اطلاعات گمانههای حفر شده در منطقه، به بررسی عوامل مهم زمین شناسی مهندسی و ژئوتکنیک در پایداری دیوارههای گود و ارائه روشهای پایدارسازی مناسب پرداخته شده است .با بررسیهای میدانی و بر اساس اطلاعات موجود، گسترش خاکها و سنگهای مارنی بررسی شده و نقشه پهنه بندی زمین شناسی مهندسی ارائه گردیده است .حدود ۲۸ درصد این منطقه به وسیله خاک-های دستی با ضخامت بیش از ۲ متر و همچنین حدود ۳۵ درصد به وسیله تودههای مارنی پوشیده شده و مابقی رسوبات آبرفتی درشت دانه است .لایهصهای مارنی به رنگهای زرد، سبز و خاکستری دیده میصشوند که به ترتیب بر مقاومت آنها افزوده میشود .تودههای مارنی منطقه چین خورده بوده و سطوح لایهبندی شیبدار است .چندین گسل ریز همراه با سطوح درزه متعدد در سنگهای مارنی دیده میشود .عمق آبصهای زیرزمینی در این محدوده بین ۵ تا بیش از ۲۰ متر تغییر میکند .برای بررسی تأثیر عوامل زمین شناسی مهندسی بر پایداری دیواره گودهای عمیق، از ۳ پروژه گودبرداری به عمقهای ۸ تا ۲۵ متر بازدید شده و اطلاعات ۲۵ گمانه جمع آوری شده است .گودهای مورد نظر شامل گود پروژه نگین ولیعصر به عمق حداکثر ۱۶ متر، گود پروژه تاوریژ به عمق ۲۵ متر و گود خیابان فروغی به عمق حدود ۸ متر هستند .در همه این پروژهها، خاکها و سنگهای محل شامل خاکهای دستی، رسوبات درشت دانه آبرفتی و سنگهای مارنی بودهاند .به آب زیرزمینی عمدهای در گودهای مذکور برخورد نشده بود و فقط به طور موضعی در برخی قسمتها تراوش آب دیده شده است .برای پایدارسازی دیوارههای این گودها، از طرحهای میخ کوبی، مهاربندی با انکر، اجرای شمع و انکر، ترکیب شیب پایدار و میخ کوبی یا انکر استفاده شده است .از بین این گودها، پایداری گود نگین ولیعصر با جزئیات بیشتری بررسی شده و تحلیل پایداری دیوارههای مختلف با نرم افزارهای Slope/W و Plaxis صورت گرفته است .وجود خاک دستی پر شده در امتداد یک دره مدفون، وجود مارنصهای زرد ضعیف و آب زیرزمینی، پایدارسازی دیوارهصهای گود نگین ولیعصر را با مشکلات جدی روبرو کرده بود .به طور کلی توجه به جنس لایههای زمین، ساختارهای زمین شناسی و شرایط آب زیرزمینی، مهمترین عوامل زمین شناسی مهندسی در طراحی و اجرای گودبرداریهای عمیق است .وجود خاک دستی، مارنهای هوازده و به خصوص اشباع، مهمترین چالشهای گودبرداری در منطقه نگین پارک تبریز است .طرحهای مناسب برای پایداری دیوارههای گودبرداری این منطقه، استفاده از شمع و انکر در مجاورت ساختمانها، انکر با پد و میخصکوبی است .در قسمتهایی که سطح آب زیرزمینی بالا است و یا با آبهای فاضلاب ساختمانهای مجاور روبرو هستیم، زهکشی اولیه قبل از گودبرداری ضروری است
Text of Note
In recent years, the depth of excavation has increased with dramatically rising land prices, the density and number of floors in buildings, and the need to provide parking and other services spaces in buildings in cities and especially in metropolitan cities. Obviously, by carrying out excavations and especially deep excavations, the instability of the excavation walls is important and requires the study and preparation and implementation of protection systems. Negin Park area in the east of Tabriz has an area of about 110 hectares with topography of the hills and valleys. Therefore, during urbanization, the upper part of the hills is cut and is cast in valleys and low lands. Marl layers are also widely spread in this area. The development of fill soils and the presence of marl layers that have a low geotechnical strength and stability are the main challenges in implementing deep excavation projects for building construction in this area. Investigating the important factors of geological engineering and geotechnics in the stability of the excavation walls in the area and providing sustainable methods, by examining the old aerial photographs and geological maps, as well as field surveys and visits to cavity and collecting information on excavations in the region, properly paid. Geological maps, satellite images, old aerial photos, as well as field studies, the spread of various soils and rocks, and geological engineering zoning maps have been presented. About 28 of the area is covered by fill soils with a thickness of more than 2 meters. Marly soils are also about 35 , and the reat is coverd by coarse grained alluvim. Marl layers are seen in yellow, green and gray colors, which increase their resistance, respectively. The marl masses of the region are folded and there are several fine faults associated with several joint surfaces. The depth of groundwater varies between 5 and more than 20 meters. From 3 deep excavation projects to depths of 8 to 25 meters, 25 boreholes have been collected to investigate the impact of engineering geological factors on the stability of the deep excavation wall. The desired excavations projects includes the Negin Valiasr Project with a maximum depth of 16 meters, Tovrizh project to a depth of 25 meters and the excavation of Foroughi street to a depth of about 8 meters. In all of these projects, the soils and rocks of the site included fill soils, coarse-grained alluvium deposits and marlstones. Major groundwater was not encountered in the above mentioned cases, and only local sewage was observed in some areas. Soil nailing, anchoring, pile and anchor have been used to stabilize the walls of these excavations. Among these excavations, the wall stability of Negin Valiasr project has been studied in more detail and the stability analysis of the walls has been done with Slope/W and Plaxis softwares. The existence of fill soil along a buried valley, the presence of weak yellow marls and groundwater, had been serious problems in stabilizing the walls of cavity of Negin Valiasr project. In general, attention to the nature of underground layers, geological structures and groundwater conditions are the most important engineering geological factors in the design and implementation of deep excavations. The existence of loose fill soils, weathered marls and especially saturation are the most important challenges for excavation in the Negin Park area. Suitable designs for stability the excavation walls of this area are the use of pile and anchors, anchors with pads and soil nailing. In areas where the groundwater level is high or with sewage water in adjacent buildings, it is essential to drain before excavation
PARALLEL TITLE PROPER
Parallel Title
Investigation on engineering geology issues in the deep excavation projects of Negin Park of Tabriz area and finding stabilization methods