برنامهریزی هماهنگ شبکهی برق و گاز طبیعی با درنظر گرفتن سیستم ذخیرهکنندهی گاز و عدمقطعیتهای بار گازی
General Material Designation
[پایاننامه]
Parallel Title Proper
Scheduling of Coordinated Electricity and Natural Gas Networks Considering Natural Gas Storage and Gas Load Uncertainty
First Statement of Responsibility
/امیر طالبی
.PUBLICATION, DISTRIBUTION, ETC
Name of Publisher, Distributor, etc.
: مهندسی برق
Date of Publication, Distribution, etc.
، ۱۳۹۸
PHYSICAL DESCRIPTION
Specific Material Designation and Extent of Item
۸۸ص.
Other Physical Details
:
GENERAL NOTES
Text of Note
زبان: فارسی
Text of Note
زبان چکیده: فارسی
NOTES PERTAINING TO PUBLICATION, DISTRIBUTION, ETC.
Text of Note
چاپی - الکترونیکی
NOTES PERTAINING TO PHYSICAL DESCRIPTION
Text of Note
جدول، نمودار
DISSERTATION (THESIS) NOTE
Dissertation or thesis details and type of degree
کارشناسی ارشد
Discipline of degree
مهندسی برق- سیستمهای قدرت
Date of degree
۱۳۹۸/۰۵/۰۱
Body granting the degree
صنعتی سهند
SUMMARY OR ABSTRACT
Text of Note
با توجه به مزایای آشکار ژنراتورهای گازسوز نسبت به دیگر ژنراتورهای فسیلی، نظیر هزینهی سرمایهگذاری پایین، بهرهوری بالاتر، توانایی پاسخگویی سریع و تولید گاز کربن کمتر، گاز طبیعی در حال تبدیل به یک انتخاب بهینه و کارآمد بعنوان سوخت برای ژنراتورهای تولید توان الکتریکی در سیستمهای قدرت است .افزایش وابستگی به گاز طبیعی بعنوان سوخت واحدهای تولید توان، تعامل بین شبکههای برق و گاز طبیعی را افزایش داده و این امر موجب بروز چالشهای جدیدی در بهرهبرداری از این دو سیستم شدهاست .برخلاف دیگر ژنراتورهای فسیلی که عرضهی سوخت برای آنها بصورت کامل درنظر گرفته میشود، ژنراتورهای گازسوز از طریق خطوط لولهی گاز که دارای ظرفیت محدود هستند، تغذیه میشوند .از سوی دیگر، ژنراتورهای گازسوز معمولا از قراردادهای قابل قطع برای دریافت سوخت استفاده میکنند که در مقایسه با بارهای گاز خانگی، اولویت پایینتری در دریافت گاز طبیعی دارند .بنابراین افزایش تقاضای بار خانگی، خصوصا در روزهای سرد زمستان، میتواند منجر به کاهش عرضهی گاز به ژنراتورهای گازسوز شود .از اینرو، عدمقطعیتهای ناشی از بار گاز خانگی میتواند تأثیر چشمگیری بر بهرهبرداری سیستم برق و گاز داشته باشد .به همین منظور، در این پایاننامه یک مدل تسویهی بازار همزمان برق و گاز با درنظر گرفتن عدمقطعیتهای بار گازی ارائه شدهاست .روش پیشنهادی بصورت یک مسألهی برنامهریزی تصادفی دو مرحلهای مدلسازی شدهاست .مرحلهی اول نشاندهندهی بازار روز بعد و مرحلهی دوم نیز نشاندهندهی بازار زمان حقیقی از طریق اعمال تعدادی سناریوی مربوط به عدمقطعیت بار گازی به مدل مورد نظر است .همچنین، از ذخیرهکنندهی گاز طبیعی به منظور افزایش کارایی شبکهی گاز استفاده شدهاست .مدل ارائه شده در این پایاننامه از نوع برنامهریزی غیرخطی آمیخته با اعداد صحیح (MINLP) بوده و از حلکنندهی DICOPT در نرمافزار GAMS به منظور حل آن استفاده شدهاست .روش ارائه شده بر روی دو شبکهی ۶ شینهی سیستم قدرت همراه با شبکهی گاز ۶ گره و شبکهی ۲۴ شینهی سیستم قدرت همراه با شبکهی گاز ۱۰ گره اعمال شده و نتایج حاصل از آنها مورد بحث و بررسی قرار گرفتهاست .
Text of Note
Due to distinct advantage of gas-fired generators over other fossil generators, including lower capital cost, higher efficiency, faster response capability and lower carbon emission, natural gas is becoming the optimal and efficient choice for fueling power generators in power systems. The increasing reliance on natural gas as a fuel for power generation units, arise the interaction between electricity and natural gas networks and this cause new challenges in the two system operation. Different from other fossil generators whose fuel suplly has been considered sufficient, the gas-fired generators are supplied through pipelines that have limited capacity. On the other hand, the gas-fired generators choose interruptible contract to use natural gas that in compared with residential gas demand, they have lower priority. So, increase in residential gas demand, especially in cold winter days, could cause decrease supply natural gas to the gas-fired generators. Consequently, residential gas load uncertainty could significantly impact operation of electricity and natural gas networks. The focus of this thesis is a simultaneous market clearing model of electricity and natural gas networks considering gas load uncertainty. This model formulated as a two stage stochastic programming. The first stage of this model represents the day-ahead market while, the second stage represents the real-time market through a number of scenarios. Also, natural gas storage has been used to improve gas network efficiency. The selected model is mixed integer nonlinear programming (MINLP) which is solved by DICOPT solver in GAMS software. The proposed model has been tested on six bus power system with a six-node natural gas network and 24 bus power system with a 10-node natural gas network and the results have been discussed.
ba
PARALLEL TITLE PROPER
Parallel Title
Scheduling of Coordinated Electricity and Natural Gas Networks Considering Natural Gas Storage and Gas Load Uncertainty
TOPICAL NAME USED AS SUBJECT
شبکهی برق و گاز طبیعی
برنامهریزی تصادفی دو مرحلهای
عدمقطعیت
ذخیرهکنندهی گاز
UNCONTROLLED SUBJECT TERMS
Subject Term
electricity and natural gas network, two stage stochastic programming, uncertainty, gas storage
Subject Term
شبکهی برق و گاز طبیعی، برنامهریزی تصادفی دو مرحلهای، عدمقطعیت، ذخیرهکنندهی گاز.
PERSONAL NAME - PRIMARY RESPONSIBILITY
طالبی، امیر
PERSONAL NAME - SECONDARY RESPONSIBILITY
صادقی یزدانخواه، احمد، استاد راهنما
ORIGINATING SOURCE
Country
ایران
Date of Transaction
20230812
LOCATION AND CALL NUMBER
Call Number
برق ،۱۰۵۴۴ ،۱۳۹۸
ELECTRONIC LOCATION AND ACCESS
Host name
یزاگ راب یاهتیعطقمدع و زاگ یهدننکهریخذ متسیس نتفرگ رظنرد اب یعیبط زاگ و قرب یهکبش گنهامه یزیرهمانرب.pdf