• Home
  • Advanced Search
  • Directory of Libraries
  • About lib.ir
  • Contact Us
  • History

عنوان
Building a project work breakdown structure

پدید آورنده
/ Dennis P. Miller

موضوع
Project management.,Work breakdown structure.

رده
HD69
.
P75
,
M536
2009

کتابخانه
Central Library, Center of Documentation and Supply of Scientific Resources

محل استقرار
استان: East Azarbaijan ـ شهر:

Central Library, Center of Documentation and Supply of Scientific Resources

تماس با کتابخانه : 04133443834

INTERNATIONAL STANDARD BOOK NUMBER

(Number (ISBN
1420069691(hbk. : alk. paper)

NATIONAL BIBLIOGRAPHY NUMBER

Country Code
IR
Number
E-8648

LANGUAGE OF THE ITEM

.Language of Text, Soundtrack etc
انگلیسی

COUNTRY OF PUBLICATION OR PRODUCTlON

Country of publication
IR

TITLE AND STATEMENT OF RESPONSIBILITY

Title Proper
Building a project work breakdown structure
General Material Designation
[Book]
Other Title Information
:visualizing objectives, deliverables, activities, and schedules
First Statement of Responsibility
/ Dennis P. Miller

.PUBLICATION, DISTRIBUTION, ETC

Place of Publication, Distribution, etc.
Boca Raton
Name of Publisher, Distributor, etc.
: CRC Press,
Date of Publication, Distribution, etc.
, c2009.

PHYSICAL DESCRIPTION

Specific Material Designation and Extent of Item
xxxv, 226 p.
Other Physical Details
: ill.
Dimensions
; 24 cm.

SERIES

Series Title
(ESI international project management series.)

GENERAL NOTES

Text of Note
"An Auerbach book."

NOTES PERTAINING TO PUBLICATION, DISTRIBUTION, ETC.

Text of Note
Print - Electronic

INTERNAL BIBLIOGRAPHIES/INDEXES NOTE

Text of Note
Includes bibliographical references and index.

CONTENTS NOTE

Text of Note
Helping project managers communicate with their teams, clients, and management, this book provides an eight-step process that facilitates the development of the work breakdown structure (WBS)
Text of Note
Section 1: Preplanning activities and issues -- 1. Preplanning issues -- 2. Sources of deliverables -- 3. Timing of planning session -- 4. Specific preparations -- Section 2. Executing the eight step process -- 5. Step 1. Find the project's deliverables -- 6. Step 2. Build and review the initial product breakdown structure (PBS) -- 7. Step 3. Building down the PBS -- 8. Step 4. Establishing the activities -- 9. Step 5. Building the physical logical diagram (the network) -- 10. Step 6. Assigning the resources -- 11. Step 7. Estimate the durations -- 12. Step 8. Verify the project timeline -- Section 3. Post-planning activities -- 13. Second pass -- 14. Manual scheduling -- 15. Scheduled network -- 16. Tracking and reporting -- 17. Resource allocation -- Section 4. Some basic project management issues -- 18. Let's practice : case study summary -- 19. Frequently asked questions (FAQs) -- 20. Essay : the WBS--worth a second look.

SERIES

Title
ESI international project management series

TOPICAL NAME USED AS SUBJECT

Project management.
Work breakdown structure.

LIBRARY OF CONGRESS CLASSIFICATION

Class number
HD69
Book number
.
P75
,
M536
2009

PERSONAL NAME - PRIMARY RESPONSIBILITY

Miller, Dennis P

ORIGINATING SOURCE

Country
ایران

ELECTRONIC LOCATION AND ACCESS

Host name
Building a Project Work Breakdown Structure: Visualizing Objectives, Deliverables, Activities, and Schedules
Access number
عادی
Compression information
عادی
Electronic name
E-8648.pdf
Bits per second
0
Contact for access assistance
ایمانی
Electronic Format Type
متن
File size
0
Record control number
E-8648
Public note
انگلیسی

old catalog

pe

BL
1

a
Y

Proposal/Bug Report

Warning! Enter The Information Carefully
Send Cancel
This website is managed by Dar Al-Hadith Scientific-Cultural Institute and Computer Research Center of Islamic Sciences (also known as Noor)
Libraries are responsible for the validity of information, and the spiritual rights of information are reserved for them
Best Searcher - The 5th Digital Media Festival