Comparison of Environmental and Social Costs of Trenchless Cured-in-Place Pipe Renewal Method with Open-Cut Pipeline Replacement for Sanitary Sewers
General Material Designation
[Thesis]
First Statement of Responsibility
Kaushal, Vinayak
Subsequent Statement of Responsibility
Najafi, Mohammad
.PUBLICATION, DISTRIBUTION, ETC
Name of Publisher, Distributor, etc.
The University of Texas at Arlington
Date of Publication, Distribution, etc.
2019
GENERAL NOTES
Text of Note
192 p.
DISSERTATION (THESIS) NOTE
Dissertation or thesis details and type of degree
Ph.D. C.E.
Body granting the degree
The University of Texas at Arlington
Text preceding or following the note
2019
SUMMARY OR ABSTRACT
Text of Note
The development of underground infrastructure, environmental concerns, and economic trends is influencing society, resulting in the advancement of technology for more efficient, environment-friendly, and cost-effective pipeline installation and renewal. Comparison of environmental and social costs of a pipeline renewal and replacement is an essential element when considering sustainable development of underground infrastructure. Project owners, decision makers, design and consulting and contractors commonly take into consideration the construction costs only, and overlook the environmental and social cost aspects while making a choice between trenchless and open-cut pipeline installation. Trenchless Cured-in-Place Pipe (CIPP) involves a liquid thermoset resin saturated material that is inserted into the existing pipeline by hydrostatic or air inversion, or by mechanically pulling-in and inflating. The liner material is cured-in-place using hot water, steam or light cured using UV light resulting in the CIPP product. The primary objective of this dissertation is to compare environmental and social costs of trenchless CIPP renewal method with open-cut pipeline replacement for small diameter sanitary sewers and to identify influencing factors Impacting costs An actual case study based on the City of Pasadena, California, river basin was used for this research to evaluate the environmental and social costs implication of small diameter CIPP renewal and open-cut replacement. The results of this dissertation, for the case study used, show that the total environmental and social costs of trenchless CIPP method is 90% less as compared to open-cut pipeline replacement for small diameter sanitary sewers, such as 8 in. to 12 in. diameters. For this case study, it was determined that the environmental impacts of CIPP will be more than its social impacts. For open-cut, the social impacts are found to be more than environmental impacts. The methodology used in this dissertations can be applied for larger pipe diameters and other locations to develop a decision tool. CIPP renewal caused less ozone depletion, global warming, smog, acidification, eutrophication, non carcinogenics, respiratory effects, ecotoxicity effects, and fossil fuel depletion. The liner, felt, and resin influenced environmental cost the most for CIPP compared to open-cut where power consumption of construction equipment, and pipe material drove the environmental cost. Cost of fuel for detour roads, detour delay, and pavement restoration were negligible for CIPP renewal method as compared with open-cut replacement that contributed a major social cost factor (approximately 75%).