• Home
  • Advanced Search
  • Directory of Libraries
  • About lib.ir
  • Contact Us
  • History

عنوان
Project Scheduling with Time Windows :

پدید آورنده
by Ulrich Dorndorf.

موضوع
Artificial intelligence.,Economics.,Operations research.

رده

کتابخانه
Center and Library of Islamic Studies in European Languages

محل استقرار
استان: Qom ـ شهر: Qom

Center and Library of Islamic Studies in European Languages

تماس با کتابخانه : 32910706-025

INTERNATIONAL STANDARD BOOK NUMBER

(Number (ISBN
3642575064
(Number (ISBN
9783642575068

NATIONAL BIBLIOGRAPHY NUMBER

Number
b570701

TITLE AND STATEMENT OF RESPONSIBILITY

Title Proper
Project Scheduling with Time Windows :
General Material Designation
[Book]
Other Title Information
From Theory to Applications
First Statement of Responsibility
by Ulrich Dorndorf.

.PUBLICATION, DISTRIBUTION, ETC

Place of Publication, Distribution, etc.
Heidelberg
Name of Publisher, Distributor, etc.
Physica-Verlag HD : Imprint : Physica
Date of Publication, Distribution, etc.
2002

PHYSICAL DESCRIPTION

Specific Material Designation and Extent of Item
(x, 166 pages 21 illustrations)

SERIES

Series Title
Contributions to management science.

CONTENTS NOTE

Text of Note
Introduction --; Optimisation Model --; Constraint Propagation --; Consistency Tests --; A Branch-and-Bound Algorithm --; Multi-Mode Extension of the Branch-and-Bound Algorithm --; Application in Airport Operations Management --; Summary and Conclusions.

SUMMARY OR ABSTRACT

Text of Note
Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning. The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach.

TOPICAL NAME USED AS SUBJECT

Artificial intelligence.
Economics.
Operations research.

PERSONAL NAME - PRIMARY RESPONSIBILITY

by Ulrich Dorndorf.

PERSONAL NAME - ALTERNATIVE RESPONSIBILITY

Ulrich Dorndorf

ELECTRONIC LOCATION AND ACCESS

Electronic name
 مطالعه متن کتاب 

[Book]

Y

Proposal/Bug Report

Warning! Enter The Information Carefully
Send Cancel
This website is managed by Dar Al-Hadith Scientific-Cultural Institute and Computer Research Center of Islamic Sciences (also known as Noor)
Libraries are responsible for the validity of information, and the spiritual rights of information are reserved for them
Best Searcher - The 5th Digital Media Festival