[a project of the Education Board of AACE International] /
First Statement of Responsibility
edited by Dr. Scott J. Amos
EDITION STATEMENT
Edition Statement
5th ed., with new appendix listings
.PUBLICATION, DISTRIBUTION, ETC
Place of Publication, Distribution, etc.
Morgantown, WV :
Name of Publisher, Distributor, etc.
AACE International,
Date of Publication, Distribution, etc.
c2004
PHYSICAL DESCRIPTION
Specific Material Designation and Extent of Item
1 v. (various pagings) :
Other Physical Details
ill. ;
Dimensions
28 cm
GENERAL NOTES
Text of Note
"A continuing project of the AACE International Education Board"--T.p. verso
Text of Note
"A Special publication of AACE International--the Association for the Advancement of Cost Engineering"--T.p. verso
Text of Note
Subtitle from cover
INTERNAL BIBLIOGRAPHIES/INDEXES NOTE
Text of Note
Includes bibliographical references and author index
CONTENTS NOTE
Text of Note
Section 1. Cost -- 1. Cost elements -- 2. Pricing -- 3. Materials -- 4. Labor -- 5. Engineering -- 6. Equipment, parts, and tools -- 7. Economic costs -- 8. Activity-based cost management -- Section 2. Cost estimating -- 9. Estimating -- 10. Process product manufacturing -- 11. Discrete product manufacturing -- Section 3. Planning & scheduling -- 12. Planning -- 13. Scheduling -- Section 4. Progress & cost control -- 14. Progress measurement and earned value -- 15. Earned value for variable budgets -- 16. Tracking cost and schedule performance -- 17. Performance and productivity management -- Section 5. Project management -- 18. Project management fundamentals -- 19. Project organization structure -- 20. Project planning -- 21. Project labor cost control -- 22. Leadership and management of project people -- 23. Quality management -- 24. Value analysis -- 25. Contracting for capital projects -- 26. Strategic asset management -- Section 6. Economic analysis -- 27. Basic engineering economics -- 28. Applied engineering economics -- Section 7. Statistics, probability, & risk -- 29. Statistics & probability -- 30. Basic concepts in descriptive statistics -- 31. Risk management -- Appendices: -- A. Glossary of terms -- B. International system of units -- C. Estimating reference material -- D. RP 11R-88: Required skills and knowledge of a cost engineer -- E. RP 17R-97: Cost estimate classification system -- F. RP 18R-97: Cost estimate classification system, as applied in engineering, procurement, and construction for the process industries -- G. RP 21R-98: Project code of accounts, as applied in engineering, procurement, and construction for the process industries -- H. Proposed scope graphic for PSP -- I. Membership information (introduction, application, canon of ethics)