• Home
  • Advanced Search
  • Directory of Libraries
  • About lib.ir
  • Contact Us
  • History

عنوان
A programmed introduction to critical pathmethods; a programed self- instruction manual

پدید آورنده

موضوع
، Critical path analysis

رده
HD
69
.
P7
.
P76

کتابخانه
Central Library of Sharif University of Technology

محل استقرار
استان: Tehran ـ شهر: Tehran

Central Library of Sharif University of Technology

تماس با کتابخانه : 66005817-021

OTHER STANDARD IDENTIFIER

Standard Number
60016

LANGUAGE OF THE ITEM

.Language of Text, Soundtrack etc
آخر۲۷
.Language of Text, Soundtrack etc
English

TITLE AND STATEMENT OF RESPONSIBILITY

General Material Designation
)10(
Title Proper
A programmed introduction to critical pathmethods; a programed self- instruction manual

.PUBLICATION, DISTRIBUTION, ETC

Place of Publication, Distribution, etc.
Cambridge, Eng.
Name of Publisher, Distributor, etc.
Oxford, Pergamon
Date of Publication, Distribution, etc.
1967

PHYSICAL DESCRIPTION

Specific Material Designation and Extent of Item
iv. )unpaged( ill.; 15 X 22 cm

SERIES

Series Title
A pergamon programmed text for industry and commerce

TOPICAL NAME USED AS SUBJECT

Entry Element
، Critical path analysis

LIBRARY OF CONGRESS CLASSIFICATION

Class number
HD
69
.
P7
.
P76

PERSONAL NAME - PRIMARY RESPONSIBILITY

Relator Code
TI
Entry Element
constructed by Cambridge Conslultants )Training( Limited

AU detimiL (gniniarT) stnatlusnoC egdirbmaC

LOCATION AND CALL NUMBER

Shelving Form of Title, Author, Author/Title
01

Proposal/Bug Report

Warning! Enter The Information Carefully
Send Cancel
This website is managed by Dar Al-Hadith Scientific-Cultural Institute and Computer Research Center of Islamic Sciences (also known as Noor)
Libraries are responsible for the validity of information, and the spiritual rights of information are reserved for them
Best Searcher - The 5th Digital Media Festival