Construction scheduling, cost optimization, and managemen
[Electronic Resource]
:a new model based on neurocomputing and object technologies
/ Hojjat Adeli, Asim Karim
London ;New York
: Spon Press,
, 2001.
1 online resource.
e
Includes bibliographical references (p. 289-313) and index.
BOOK COVER; TITLE; COPYRIGHT; DEDICATION; CONTENTS; PREFACE; ACKNOWLEDGMENT; ABOUT THE AUTHORS; 1 INTRODUCTION; 2 OVERVIEW OF NEURAL NETWORKS IN CIVIL ENGINEERING; 3 NEURAL DYNAMICS MODEL AND ITS APPLICATION TO ENGINEERING DESIGN OPTIMIZATION; 4 PROJECT PLANNING AND MANAGEMENT AND CPM; 5 A GENERAL MATHEMATICAL FORMULATION FOR PROJECT SCHEDULING AND COST OPTIMIZATION; 6 NEURAL DYNAMICS COST OPTIMIZATION MODEL FOR CONSTRUCTION PROJECTS; 7 OBJECT-ORIENTED INFORMATION MODEL FOR CONSTRUCTION PROJECT MANAGEMENT; 8 THE CONSCOM FRAMEWORK